Skip to content
FleetPedia

The Public Fleet Reference

All subjects

Read by subject

Measuring Performance

Every measure here has a way of being read backwards. Cost per mile puts your least-used vehicles at the top of the replace list. A fleet-wide availability figure hides four plows down out of six. They are meant to be read together.

10 entries · 4 stages · about 11 min to read

1

Choosing what to report

A scorecard carrying forty numbers is an archive, not a scorecard.

2

Is the fleet working

Two measures that mean several different things depending on who is counting.

3

What it costs, and what that hides

The measures most likely to point confidently at the wrong vehicle.

4

Do you need all of them

The measures behind almost every fleet reduction.

The FleetPedia Challenge

Think you know Measuring Performance?

Performance, Utilization and Policy. Every answer explains why.

Start the quiz: 15 questions

Coverage on this subject

Who supplies this

Sections of the Solutions Guide covering this subject. Open one to see who is listed.

Fleet Management Information Systems (FMIS) 8 listings

See the whole section

Fleet Consulting and Studies 5 listings

See the whole section

Motor Pool and Reservation Systems 6 listings

See the whole section