Virginia DOT Stages 12,000 Winter Equipment Pieces and 700,000 Tons of Salt Statewide
The agency also has more than 1.9 million gallons of brine in reserve to treat its 128,000-plus lane miles of roadway.
Source: Virginia Department of Transportation ↗
The Virginia Department of Transportation has staged more than 12,000 pieces of winter equipment and 700,000 tons of salt, sand and treated abrasive statewide ahead of the winter season.
The agency, which maintains more than 128,000 lane miles of roadway across Virginia, also holds more than 1.9 million gallons of brine in reserve. Before the first storm, mechanics check everything from plow blades to salt and sand spreaders and make needed repairs.
“Safety is at the forefront of everything we do at VDOT. We plan throughout the year to ensure our crews are prepared for winter weather,” said Anne Booker, acting chief of maintenance and operations.
VDOT works with contractors to prepare for, plow and treat winter weather conditions. “Our preparations include not only materials and equipment used to treat roads, but employees and contractors who help us deliver a safe and reliable transportation system for drivers,” Booker said.









